Preparing an engineering technical report for a water network buried underground and sea water pumps for the benefit of East Port Said (East Port Said Port) (to indicate design errors and based on the report, the previous system was replaced)
Preparing a report for the project to raise the efficiency of line 3 and 4 of the National Cement Company (at a cost of one billion and two hundred million Egyptian pounds) – Helwan, Cairo. The arbitration case is still pending between the National Company and Aresco (based on the submitted report)
The consultant worked for a period as an insurance expert to prepare reports for the National Bank of Egypt through the “Consulting Group” at the Faculty of Engineering, Cairo University.